• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Adjustment Method Of Dual Needle Vehicle Phase Time

    2014/2/15 17:19:00 100

    Double Needle CarTextile MachineryTextile Equipment

    < p > all kinds of < a href= "http://www.91se91.com/news/index_c.asp" > double needle car < /a > have a headache problem, that is, the car is unstable.

    Maintenance rate is very high, especially after a few years, a lot of phase time is a bit messy, a lot of machine repair is how to adjust the adjustment is not good, according to the editor's point of view, a lot of phase time is well adjusted, there are no many problems.

    < /p >


    < p > first, let's start with pins and cloth teeth.

    First, the cloth delivery (adjusting dial) is pferred to zero. When the cloth is not delivered, the flywheel is rotated so that the needle post is at the bottom dead center.

    Loosen the horizontal delivery arm rocker fastening screws, adjust the distance between the inner side of the needle bar and the presser bar to 1.5mm.

    If it is not adjusted, it will cause needle jumping and broken needles.

    < /p >


    < p > notice that there will be a change in the needle dropping point after adjusting the hole of the cloth hole, and it is necessary to adjust the feeding gear to cooperate.

    The delivery time should be adjusted to the point of the horizontal feeding cam and the cutting point of the lower shaft.

    The horizontal feeding cam should not be misplaced, otherwise it will make the rotation heavy, so that the needle will enter the center of the feeding hole. (very important, otherwise there will be a floating line phenomenon.) one mistake is that the general machine repair will adjust the needle bar to match the feeding hole and the drop point is not in the middle of the feeding hole, especially the long Kong Shihou! < /p >


    < p > again is the time of needle and shuttle.

    The lower dead point of the needle is adjusted according to the cloth condition of < a href= "http://www.91se91.com/news/index_c.asp" > sewing < /a >.

    When the needle goes up from the lower dead point to 2.2mm (or the lower end of the lower line and the needle sleeve is flat), the distance between the needle and the shuttle spindle is 0-0.05mm, the distance between the needle and the needle is 0-0.07mm, and the center line of the needle is consistent with that of the spindle.

    It depends on the actual situation.

    < /p >


    < p > turn the handwheel, so that the back line is placed in the final position.

    The inner shuttle is rotated to the opposite direction in the reverse direction of the rotating shuttle to make the shuttle gear contact with the needle plate slot.

    Loosen the fastening screws of the withdrawal line hook, so that the gap between the inner shuttle triangular block and the back line hook is too large for the 0.2-0.3mm. gap, causing loose and broken lines.

    The clearance is too small, resulting in the damage of the thread withdrawal hook.

    < /p >


    < p > don't forget that the gap between the top of the needle slot and the shuttle is adjusted to 0.8-1.0mm.. The replacement of the a href= "http://www.91se91.com/news/index_c.asp" > the shuttle spindle < /a > is replaced by the sleeve plate on the rotating spindle.

    Misunderstanding two is that the general machine repair will pad the needle board to adjust its clearance.

    < /p >


    < p > finally, the matching time of the upper shaft and the lower shaft is removed from the gear wheel.

    Turn the handwheel to make the marking of the hand wheel and the cutting edge of the car on the top.

    Rotate the lower shaft, so that there is a small hole on the frame and first screws on the lower shaft gear wheel.

    Ensure that the upper axle and the lower shaft are not moved, and the synchronous toothed belt is installed.

    If the time is not right, the needle dropping point, delivery time and mechanical clamping will be sent.

    < /p >

    • Related reading

    The Total Number Of Spindles Exceeds 120 Million, And The Scale Of Textile Machinery Industry Needs To Be Changed.

    Equipment matching
    |
    2014/2/12 19:02:00
    47

    How To Make Chinese Lace Stand Alone In Xin Gang Spinning Machine

    Equipment matching
    |
    2014/2/12 15:01:00
    27

    Eyeball: Where Is The Adjustment Of Textile Machinery?

    Equipment matching
    |
    2014/2/10 11:18:00
    115

    Development Of SALS Small Angle Laser Scattering Measuring Instrument For Chemical Fiber Measurement

    Equipment matching
    |
    2014/1/31 21:47:00
    10

    臺州市2013年工業(yè)縫紉機(jī)量增價漲

    Equipment matching
    |
    2014/1/26 20:28:00
    17
    Read the next article

    10 Major Tax Time Requirements

    When the relevant costs and expenses actually incurred in the year are not available in time for various reasons, the enterprise can calculate the amount of the quarterly income tax in advance according to the amount of the book payment. However, when the settlement is paid, the effective certificate of the cost and cost should be supplemented. Next, let's take a look at the 10 major tax time requirements that must be focused.

    主站蜘蛛池模板: AAAA级少妇高潮大片在线观看| 国产八十老太另类| 亚洲av之男人的天堂网站| 亚洲av无码专区在线观看成人| www.综合色| 色综合久久综合网观看| 日本人视频-jlzzjlzzjlzz| 吃奶呻吟打开双腿做受在线视频| 久久精品国产只有精品66| 进进出出稚嫩娇小狭窄| 成人毛片18女人毛片免费视频未| 国产香蕉国产精品偷在线| 亚洲妇女水蜜桃av网网站| 91精品国产9l久久久久| 波多野结衣黑人| 天天拍天天干天天操| 啊轻点灬大ji巴太粗太长了免费 | 久久棈精品久久久久久噜噜| 7m精品福利视频导航| 波霸女的湮欲生活mp4| 国产欧美日韩精品第一区| 亚洲国产天堂久久综合| 青青青国产在线| 婷婷久久久五月综合色| 亚洲小视频在线播放| 韩国免费一级片| 奇米视频888| 伊人久久五月天| av无码免费一区二区三区| 樱花www视频| 又大又紧又硬又湿a视频| 69影院毛片免费观看视频在线| 欧美日韩精品一区二区三区高清视频 | 美女被免费视频网站a| 无码人妻丰满熟妇区五十路| 人人人妻人人澡人人爽欧美一区| eeuss影院www在线观看免费| 波多野结衣在线免费视频| 国产成人亚综合91精品首页| 久久午夜无码鲁丝片直播午夜精品 | 撕开老师的丝袜白丝扒开粉嫩的小|