• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Equipment Repair Contract

    2009/5/12 14:20:00 42037

    The following terms are hereby negotiated through the amicable negotiation between the company and the company (hereinafter referred to as the ordering party) and through friendly negotiation.

    The first definition

    The "acceptance manual" refers to a document provided by the contractor and confirmed by both parties for the inspection equipment to be in conformity with the technical specifications and the specified data standards.

    "Specified data" refers to the drawings, data and other information necessary for the implementation of this agreement related to this system.

    "Defects or defects" refers to the equipment (structure or performance) that does not meet the relevant requirements of the acceptance manual.

    "Site acceptance" is the final acceptance of the equipment repaired by the designated manufacturer according to the acceptance manual.

    "Technical specification" means schedule A of this agreement.

    Second repair items

    Project content

    The performance of the equipment must comply with the specified performance, meet the specifications of technical specifications and data, and submit all applicable, necessary drawings, data and other technical information.

    The Contractor shall accept the necessary supervision and inspection of the contractor during his work.

    The Contractor shall prepare and submit 2 copies of the draft acceptance manual for the given supplier before September 2002.

    The authorized party shall consider and agree to the acceptance manual within the day.

    The provisions of this Agreement shall be inconsistent with the provisions of the annex, subject to the provisions of this agreement.

    If the inspection manual is inconsistent with the technical specification or the specified data, the technical specification and the specified data shall prevail.

    Third repairs

    Fourth payments

    After receiving the invoice from the contractor, the ordering party must pay the contractor the following time limit:

    After the equipment is repaired, the vehicle must be paid 320 thousand yuan once a month after acceptance.

    Fifth delivery and acceptance

    The Contractor shall complete the repair and commissioning work of the equipment before November 25, 2002, and complete the inspection stipulated in the acceptance manual. At the same time, the Contractor shall sign the equipment acceptance document and prove that the inspection has been completed.

    The acceptance documents should be marked with the defects that both parties agree and should be corrected by the Contractor within the agreed time period.

    Site acceptance should take place in November 26, 2002.

    Sixth changes

    Any changes to the main contents or schedules of this contract shall be made in writing from the date of entry into force of the contract. Details shall be made of the changes in the specifications, prices, performance, design, date of acceptance, the replacement performance of the delivered or ready to deliver spare parts, and other important matters of this agreement, and shall be signed by both parties.

    In order to repair defects or improve equipment, the contractor may make minor changes or corrections to the technical specifications, provided that such changes do not seriously affect the total purchase price, functional characteristics, performance and replacement performance of spare parts.

    Seventh guarantees

    The contractor will not guarantee that the equipment will not meet the technical specifications due to defects in the material and process of the equipment and design imperfection.

    From the date of acceptance of the equipment and parts, if the failure occurs within six months, the Contractor shall be responsible for the replacement or repair within 7 days from the receipt of the notice of the notifying party, and the expenses incurred therefrom shall be borne by the contractor.

    If the Contractor fails to fulfill the above warranty, he shall bear all losses arising from the contractor.

    Eighth others

    This contract is a complete agreement between the parties hereto. All statements, negotiations, letters, commitments, agreements, consultations and contracts made by the previous two parties or their agents concerning any matter or thing that are applicable or involving the contract shall be revoked, whether written or oral.

    Contractor party

    Specific date

    • Related reading

    Market Place Lease Contract

    Contract template
    |
    2009/5/8 14:18:00
    42027

    Application For Pportation Change

    Contract template
    |
    2009/5/5 15:26:00
    42033

    Contract Of Foreign Exchange Loans For Working Capital

    Contract template
    |
    2009/5/3 14:51:00
    42050

    Equipment Repair Contract

    Contract template
    |
    2009/4/29 14:33:00
    42053

    Joint Venture Contract Model

    Contract template
    |
    2009/4/28 15:34:00
    42065
    Read the next article

    Notice On The Implementation Of The "Social Insurance Auditing Method"

    The labor and social security department (bureaus) of all provinces, autonomous regions and municipalities directly under the Central Government: the "social insurance auditing method" (hereinafter referred to as the "auditing method") has been officially promulgated in February 27th and will be implemented from April 1st. In order to effectively carry out the implementation of the "auditing method", we hereby notify the following issues: first, carry out extensive and in

    主站蜘蛛池模板: 吃奶呻吟打开双腿做受视频| 用舌头去添高潮无码视频| 看全色黄大色黄女视频| 成年18网站免费视频网站| 国产精品视频永久免费播放| 嗯~啊太紧了妖精h| 亚洲国产婷婷六月丁香| 一级黄色免费大片| 综合图区亚洲欧美另类小说| 日韩精品欧美视频| 国产成人亚洲综合一区| 久久精品国内一区二区三区| 麻豆一区二区99久久久久| 欧美老熟妇欲乱高清视频| 国产麻豆videoxxxx实拍| 亚洲欧美日韩国产综合| 5g996未满十八| 欧美一区二区三区精品影视| 国产激情视频一区二区三区| 久久精品无码专区免费东京热 | 色欲综合久久中文字幕网| 欧美日本免费一区二区三区| 女人是男人的未来视频| 人妻少妇精品久久久久久| 97国产免费全部免费观看| 精品国产一二三产品价格| 无码人妻精品一区二区| 国产叼嘿久久精品久久| 久久中文精品无码中文字幕| 国产性夜夜夜春夜夜爽| 欧美人与牲动交xxxx| 好硬好湿好大再深一点动态图 | 日韩在线不卡免费视频一区| 国产精品亚洲欧美大片在线看| 亚洲av中文无码乱人伦在线观看| 韩国精品一区视频在线播放| 新版bt天堂资源在线| 免费一级毛片在线播放| 20岁chinese魅男gay| 日韩aⅴ人妻无码一区二区| 四虎永久成人免费影院域名|