    Equipment Repair Contract

    2009/4/29 14:33:00 42053

    The following terms are hereby negotiated through the amicable negotiation between the company and the company (hereinafter referred to as the ordering party) and through friendly negotiation.

    The first definition

    The "acceptance manual" refers to a document provided by the contractor and confirmed by both parties for the inspection equipment to be in conformity with the technical specifications and the specified data standards.

    "Specified data" refers to the drawings, data and other information necessary for the implementation of this agreement related to this system.

    "Defects or defects" refers to the equipment (structure or performance) that does not meet the relevant requirements of the acceptance manual.

    "Site acceptance" is the final acceptance of the equipment repaired by the designated manufacturer according to the acceptance manual.

    "Technical specification" means schedule A of this agreement.

    Second repair items

    Project content

    The performance of the equipment must comply with the specified performance, meet the specifications of technical specifications and data, and submit all applicable, necessary drawings, data and other technical information.

    The Contractor shall accept the necessary supervision and inspection of the contractor during his work.

    The Contractor shall prepare and submit 2 copies of the draft acceptance manual for the given supplier before September 2002.

    The authorized party shall consider and agree to the acceptance manual within the day.

    The provisions of this Agreement shall be inconsistent with the provisions of the annex, subject to the provisions of this agreement.

    If the inspection manual is inconsistent with the technical specification or the specified data, the technical specification and the specified data shall prevail.

    Third repairs

    Fourth payments

    After receiving the invoice from the contractor, the ordering party must pay the contractor the following time limit:

    After the equipment is repaired, the vehicle must be paid 320 thousand yuan once a month after acceptance.

    Fifth delivery and acceptance

    The Contractor shall complete the repair and commissioning work of the equipment before November 25, 2002, and complete the inspection stipulated in the acceptance manual. At the same time, the Contractor shall sign the equipment acceptance document and prove that the inspection has been completed.

    The acceptance documents should be marked with the defects that both parties agree and should be corrected by the Contractor within the agreed time period.

    Site acceptance should take place in November 26, 2002.

    Sixth changes

    Any changes to the main contents or schedules of this contract shall be made in writing from the date of entry into force of the contract. Details shall be made of the changes in the specifications, prices, performance, design, date of acceptance, the replacement performance of the delivered or ready to deliver spare parts, and other important matters of this agreement, and shall be signed by both parties.

    In order to repair defects or improve equipment, the contractor may make minor changes or corrections to the technical specifications, provided that such changes do not seriously affect the total purchase price, functional characteristics, performance and replacement performance of spare parts.

    Seventh guarantees

    The contractor will not guarantee that the equipment will not meet the technical specifications due to defects in the material and process of the equipment and design imperfection.

    From the date of acceptance of the equipment and parts, if the failure occurs within six months, the Contractor shall be responsible for the replacement or repair within 7 days from the receipt of the notice of the notifying party, and the expenses incurred therefrom shall be borne by the contractor.

    If the Contractor fails to fulfill the above warranty, he shall bear all losses arising from the contractor.

    Eighth others

    This contract is a complete agreement between the parties hereto. All statements, negotiations, letters, commitments, agreements, consultations and contracts made by the previous two parties or their agents concerning any matter or thing that are applicable or involving the contract shall be revoked, whether written or oral.

    Contractor party

    Specific date

     

    • Related reading

    Joint Venture Contract Model

    Contract template
    |
    2009/4/28 15:34:00
    42065

    Agreement On Equity Pfer Of Limited Liability Company

    Contract template
    |
    2009/4/28 15:31:00
    42073

    Model Contract For Foreign Equity Pfer

    Contract template
    |
    2009/4/28 15:27:00
    42052

    Contract Of Lending For Affiliated Stock Capital

    Contract template
    |
    2009/4/23 15:51:00
    42067

    Franchising Contract Template

    Contract template
    |
    2009/4/21 17:33:00
    42050
    Read the next article

    Administrative Supervision Of Social Insurance Funds

    The Decree No. twelfth of the Ministry of labor and social security has passed the ministerial meeting of the Ministry of labor and social security on the 8 day of May 2001. It is hereby promulgated and shall come into force on the date of promulgation. ..

    主站蜘蛛池模板: 黄网站欧美内射| 五月开心播播网| 97精品国产一区二区三区| 激情综合色综合啪啪开心| 夜色私人影院永久入口| 亚洲黄色在线电影| 91麻豆精品福利在线观看| 欧美综合一区二区三区| 国产精品女上位在线观看| 亚洲免费观看视频| 久久国产免费福利永久| 日韩精品久久无码人妻中文字幕| 国产日韩一区二区三区在线观看| 久久躁狠狠躁夜夜av| 车车好快的车车流水网站入口| 无码国产色欲XXXXX视频| 国产-第1页-浮力影院| 一本伊大人香蕉在线观看| 男女深夜爽爽无遮无挡我怕| 在线看的你懂的| 亚洲国产精品无码成人片久久| 免费黄色福利视频| 日本在线视频WWW鲁啊鲁| 啊轻点灬大ji巴太粗太长了视| 一人上面一个吃我电影| 波多野结衣伦理片在线观看| 国产精品狼人久久久久影院| 亚洲Av高清一区二区三区| 被公侵犯肉体中文字幕电影 | 嫩b人妻精品一区二区三区| 免费乱理伦在线播放| 538在线观看| 日韩精品一区二区三区在线观看| 国产亚洲精品2021自在线| 一本色道久久88亚洲精品综合| 激情另类小说区图片区视频区 | 波多野结衣精品一区二区三区| 国产精品白嫩在线观看| 久久精品久久久久观看99水蜜桃| 色偷偷88888欧美精品久久久| 女人是男人未来1分50秒|