• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Engineering Planning And Design Contract

    2014/7/20 15:29:00 44

    Project PlanningDesignContract

    Contract No: No.


    This contract is signed by the following two parties in the city of China:


    Party A: Ltd.


    Party B: Ltd.


    Party A and Party B have reached the cost contract and jointly abide by the implementation of the overall planning documents of the project.


    The first design content


    Party B designs the project for the first party, and the general planning document of the project.


    A. general layout of party a factory;


    B. Party A's first, second, third phase analysis and planning of production scale, product and technical plan of the project.


    C. Party A's technical and economic benefits analysis and prediction.


    Second article Design deadline


    Upon receipt of the design information provided by Party A, Party B will deliver to Party A the general planning document of the project.


    Third design rewards and payment methods


    A party will pay the design remuneration to RMB B, m, t, t, t, t, t, yuan, and B in two phases.


    A. after the signing of this contract, it will be paid within the working day.


    B. Party B shall submit the master plan document of the project, which is approved by Party A, and shall be paid within a working day.


    The fourth parties obligation


    A. obligations of Party A


    (1) to provide Party B with the basic information needed to compile the master plan documents for the project.


    (2) pay remuneration to Party B on schedule.


    B. obligations of Party B


    (1) deliver the master plan documents and related drawings and technical documents of the project on schedule.


    (2) solve the technical problems related to the project master plan document in time.


    Fifth article Acceptance of work


    A. the general planning document of the construction project of Party committee of Party A shall be examined by the expert committee of Party A.


    B. The Expert Committee of Party A shall, within the working days from the date of receipt of the master plan document submitted by Party B to the party, submit an examination and comment on the project within the working day of the company's general plan documents, and the Party committee of experts shall not submit any opinions within the time limit mentioned above.


    C. Party A's Committee of experts shall raise objections or opinions on the general planning documents of the project. Party B shall submit to Party A Expert Committee a review within second working days after receiving the objection or opinion of Party committee or Party committee. After Party A's expert committee's examination and approval, the general planning document of the project is not approved. Party A has the right to refuse to accept the master plan document of the project.


    Sixth others


    This Agreement shall have the same legal effect. The parties concerned are responsible for the implementation of relevant legal procedures.


    Party A (Gai Zhang): Party, company (Gai Zhang)


    Authorized representative (signature): Authorized Representative (signature):


    This is the year of the year.

    • Related reading

    Agreement On Capital Operation Cooperation

    Contract template
    |
    2014/7/20 15:24:00
    40

    How To Draw Up The Responsibility Book For Production Safety?

    Contract template
    |
    2014/7/20 15:18:00
    60

    Commercial Draft Acceptance Agreement

    Contract template
    |
    2014/7/20 15:11:00
    34

    Establishment Of Limited By Share Ltd Capital Contribution Agreement

    Contract template
    |
    2014/7/20 15:07:00
    34

    Designated Procurement Contract For Government Procurement

    Contract template
    |
    2014/7/20 15:03:00
    52
    Read the next article

    Contract For Undertaking Foreign Projects

    The construction supervision of the contracted project and the inspection of the construction of Party B shall be borne by the staff authorized by the engineer or the management. If Party A Engineer considers that the progress of the project is slow, Party B may give written warning to Party B, require additional workers, increase machinery and equipment, work overtime and take other measures to ensure smooth and timely completion of the project. All these expenses shall be borne by Party B.

    主站蜘蛛池模板: 91成人在线观看视频| 久久国产精品久久| 国产精品久久久久鬼色| 日本视频免费在线| 四虎影院永久在线| sss日本免费完整版在线观看| 狠狠躁日日躁夜夜躁2022麻豆 | 国产亚洲漂亮白嫩美女在线 | 亚洲天天做日日做天天欢毛片| 色老太婆bbw| 护士又湿又紧我要进去了| 免费国产在线视频| 2020年亚洲天天爽天天噜| 日韩一区二区三区精品| 午夜a级成人免费毛片| 91资源在线观看| 日韩乱码人妻无码中文字幕久久| 噜噜噜综合亚洲| 97人妻人人揉人人躁人人| 日韩美aaa特级毛片| 午夜在线视频一区二区三区| 99re最新地址精品视频| 晚上睡不着来b站一次看过瘾| 四虎影8818| 91久久精品国产免费一区| 日韩国产成人精品视频| 免费的一级毛片| 一个人看的毛片| 故意短裙公车被强好爽在线播放| 俄罗斯激情女同互慰在线| 麻豆视频免费观看| 性高湖久久久久久久久| 亚洲女成人图区| 色爱无码av综合区| 在线观看特色大片免费网站| 久久青青草视频| 男人一进一出桶女人视频| 国产成人精品久久一区二区三区| 一级一毛片a级毛片| 欧美一区二区影院| 午夜福利视频合集1000|