• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Urban Heat Supply Contract

    2011/1/19 14:14:00 64

    Urban Heat Supply Contract

    Contract No.:


    Venue:


    When signing the contract, I asked:


    The heat supply people are: heat, power and humidity.


    He uses hot man: he is a man, a man is a man.


    In order to clarify the rights and obligations of the heating people and the heat users in the thermal supply and use, according to the contract law of the People's Republic of China and other relevant laws, regulations and regulations, the contract shall be concluded through consultation between the two parties, so as to abide by them.


    The first place is to use the heat location, area and heat.


    (1) the hot spot: the hot spot: the main points of the hot spot are: 1.


    (two) using hot area (calculated according to the statutory floor area): the square area of the area is the square meter, and the charge area is square meters.


    (three) the amount of heat used is: the amount of steam is 1 / 2 / h / T / h; the hot water for living is hot, coke and hourly.


    Second heating period and quality


    (1) the heating person shall heat the hot person in the heating period prescribed by the local government.

    The heating time in winter is about every year.


    (two) during the heating period, the quality of heating should conform to the quality standards stipulated by the state under the normal conditions of supply and utilization of heat. The heating people should ensure that they use the heat parameters normally.


    Third standard of heat fee and method of settlement


    (1) heating price: according to the types of heating and the thermal properties of the hot people, the heating people shall collect the heat fee according to the price approved by the government of the government of the government.


    During the validity period of the contract, the price adjustment shall be carried out in accordance with the price adjustment documents.


    (two) in the case of heating, the hot person should pay the heating fee to the heating person in full before the month of the year.

    In other ways, we should use heat and settle the heat monthly.


    Boundary and maintenance management of fourth heat supply facilities and thermal power facilities


    Through consultations between the heating people and the hot people, we confirm that the boundary of the property rights for the supply and use of the thermal facilities is located in the area of the company.

    The two sides are responsible for the maintenance, repair and renovation of the heat supply facilities.


    Fifth ways of heating people's rights and obligations


    He has the right to supervise and inspect the use of heat and the operation of the facilities.


    He (two) oversees the use of heat in hot spots, quantities and ranges stipulated in the contract, and has the right to prevent excessive use of heat.


    (three) for new heating users, the heating people have the right to check and accept the heating system before heating.


    (four) if the hot person violates the operation rules, causing the number of the meter to display discrepancy with the actual heating quantity and forgery the heating record, the heating person shall have the right to request the hot person to rectify immediately.

    The hot person should collect the heat fee of the month according to the heat fee of the highest heating month in the heating period.


    (five) the heating people shall have the right to interrupt the heating supply when using the hot human heat facilities or the safety management to have unsafe hidden dangers, which may cause damage to the heating facilities, or refuse to pay the fees within the time limit stipulated in the contract.


    (six) the heating facilities within the scope of the heating property rights are malfunctioning. If they can normally heat or stop heating for more than 8 hours, the heating people shall notify the heat users, and immediately organize rush repairs to restore the heating in time.


    (seven) heating people need to stop heating when they need to stop heating because of temporary overhauling of heating facilities or illegal use of heat.

    For interruption of heating due to force majeure and other reasons, the heating people should rush to repair in time, and notify the hot person in the hour.


    He (eight) has the obligation to supply heat to the people in accordance with the quantity, quality and scope of use stipulated in the contract.


    Sixth ways to use the rights and obligations of hot people


    (1) supervise the heating people to provide heat to the heat users according to the quantity and quality stipulated in the contract.


    He (two) has the right to recheck the heat fee and the determined heat price charged by the heating supplier.


    (three) to increase or increase the use of heat by hot people, the heating application procedures should be handled to the heating people, and the relevant matters shall be handled according to the regulations.


    Lawyer 365


    (four) the hot person should change the heat property, change the name of the store, reduce the heat consumption, suspend or stop using heat, move the list and pfer the hot address.

    When the heat is stopped, the heat charge should be cleared up.


    (five) in case of any change in the hot bank account or account number, the heating person should be informed in time.


    (six) the heat shall be paid to the heating people in accordance with the contract.


    He (seven) should earnestly maintain and timely repair the thermal facilities within the scope of his own property rights.


    Seventh breach of contract liability


    (1) the liability of the heating supplier for breach of contract


    1, because the responsibility of the heating person fails to supply heat to the hot person in accordance with the time limit stipulated in the contract, in addition to the reduction of the standard heat price according to the time of delayed heating, or the refund of the heat consumption fee, the penalty fee should be paid to the heat user.


    2. Because of the accident caused by the heat supplier, the heat supplier shall be liable for the loss caused by the hot person.

    The heat supply person shall reduce or refund the heat fee that the heating people actually do not meet the quality standard of heating.


    However, one of the following situations has caused the heating quality to fall short of the prescribed standard.


    (L) changing the living room structure and indoor heating facilities without authorization.


    (2) indoors due to improper decoration and insulation measures, the heating effect is affected.


    (3) interruption of heating due to water interruption and power failure.


    (4) normal maintenance, repair and heating commissioning of thermal facilities.


    3, the heating facilities of the heating people are in trouble, failing to notify the hot people in time and causing losses to the heat users, the heating people shall be liable for compensation.


    4, due to force majeure or the government's behavior to stop heating, if the use of hot people suffer losses, the heating people shall not be liable for compensation.


    (two) using the hot man's liability for breach of contract


    1, the hot money should be paid late if it is overdue.

    If the heating fee and late fee are not paid for one month overdue, the heating side shall have the right to heat or stop.

    Heat supply


    2, if the hot person violates the contract, the hot person should pay a penalty for the heat supply to the heating person.


    3. Use the hot person to conduct construction heating without permission. The heating people have the right to stop heating immediately.

    Use heat

    A person shall compensate for the losses suffered by the heating people.

    The amount of loss shall be calculated according to the unauthorized construction of the hot building area and the actual heating days.

    It is difficult to determine the time when the construction starts unauthorized.


    Eighth contract validity period


    The contract period is in the year of the year of the year.


    Ninth contract changes


    If the parties concerned need to amend the terms or conditions of the contract, the supplementary agreement shall be signed by both parties through consultation. The supplementary agreement shall have the same effect as this contract.


    Tenth controversial solutions


    If the contract is in dispute in the course of performance, it shall be settled through consultation between the parties concerned.

    It can also be settled through mediation, through mediation.

    If negotiation or mediation fails, arbitration shall be arbitrated by both parties.


    Eleventh other agreements


      ______________________________________________________________________________________________________________________________________________________________________________________________________


      

    Heat supply

    A hot person


    (Gai Zhang): I am very sorry. (Gai Zhang):


    Residence:


    The legal representative is the legal representative.


    (signature):


    A principal agent is a principal agent.


    (signature):


    Bank of deposit: Bank:


    Account number:


    Tel:

    • Related reading

    Contract For Auction Of Prospecting Right And Mining Right

    Contract template
    |
    2011/1/18 15:34:00
    59

    Software Bundling Cooperation Protocol

    Contract template
    |
    2011/1/17 10:35:00
    78

    Annual Technical Support Service Contract

    Contract template
    |
    2011/1/15 13:22:00
    64

    Graphic Design Contract

    Contract template
    |
    2011/1/14 10:15:00
    86

    Engineering Consulting Service Contract

    Contract template
    |
    2011/1/13 11:04:00
    66
    Read the next article

    "Labor Shortage" Coercion Clothing Enterprises To Buy Robots In Colleges And Universities

    Unable to recruit workers, many small business owners in Zhejiang use robots. They save time and do not need to rest. Yesterday, the provincial people's Congress held a group meeting in Hangzhou.

    主站蜘蛛池模板: 亚洲欧美日韩成人一区在线| 精品国偷自产在线视频| 美女张开腿黄网站免费| 日韩一区二区三区精品| 国产手机在线αⅴ片无码观看 | 久久久久国产精品免费免费搜索| 精品福利视频网站| 日韩精品无码一区二区三区| 国产麻豆精品原创| 初尝黑人巨砲波多野结衣| 一级毛片免费在线| 精品久久精品久久| 日韩福利在线视频| 国产又粗又长又硬免费视频| 亚洲欧美成人影院| 2019中文字幕在线视频| 男人进去女人爽免费视频国产 | 国产女人乱子对白AV片| 亚洲成年人电影在线观看| 一级毛片黄色片| 精品亚洲麻豆1区2区3区| 好男人影视官网在线www| 亚洲色偷偷色噜噜狠狠99| 538prom在线| 最近的中文字幕大全免费版| 国产青草视频免费观看97| 亚洲国产综合人成综合网站00| 2021国产成人午夜精品| 日韩人妻无码一区二区三区久久 | 午夜dj在线观看免费高清在线| www.色亚洲| 欧美日韩国产成人综合在线| 国产精品一区视频| 久久久高清日本道免费观看| 精品无人区麻豆乱码1区2区 | 欧美国产成人精品一区二区三区| 国产日韩在线观看视频| 中文精品字幕电影在线播放视频| 精品国产一二三产品价格| 国内一级黄色片| 久久精品国产99国产精品澳门|