• <abbr id="ck0wi"><source id="ck0wi"></source></abbr>
    <li id="ck0wi"></li>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li><button id="ck0wi"><input id="ck0wi"></input></button>
  • <abbr id="ck0wi"></abbr>
  • <li id="ck0wi"><dl id="ck0wi"></dl></li>
  • Home >

    Contract Model For Garment Hair Processing

    2010/5/21 18:19:00 95

    Garment processing contract


    Source: Author:


      

    Garment processing contract


    Party A (Supplier): the company's Contract No.: No.


    Party B (processing party): the location of the contract is: the company's location is: "


    Through friendly consultations, the following agreements have been drawn up:


    First, sign the time: the year of the year, the date of delivery, the place of delivery:


    INVOICE NO.? Goods? Name? Quantity? Time of shipment? Unit price? Each item? Cost price? Remarks.


    On the other hand, it is the same.


    Two. Party A has commissioned processing under the "production processing and production order" mode. It has clearly commissioned the style, quantity, delivery date, and OK model, process requirements and quality standards of the processed garments, which is recognized by both parties as a part of the contract and has the same legal effect as the contract.

    If there is a need to change the board or other special needs in the middle of production, there must be written notice.


    Three, Party B is responsible for the two-way pportation cost of each production and processing sheet.

    The sewing thread is provided by the company, and the cost is borne by the company.

    The supplier of the line is: the price of the cable, the price of the line is:


    Four, Party B shall have all the technical and technical data, samples, marks and models checked by Party A to confirm that there is nothing wrong with it, so that it can be put into production.

    If there are any problems, inform Party A in time.

    Otherwise, the quality problem and the economic loss will be borne by the processing party.


    Five, Party B should produce quality and quantity according to the contract and deliver the goods on time.

    As Party B's liability is not responsible for shipment, it will be compensated according to the retail price of this quantity and the penalty for the delay of the contract period.

    If it is overdue one day, it will be charged 1% of the total price of the goods. If it is two days overdue, 2% of the total price of the goods is deducted, and so on, if the party fails to deliver the goods on time due to the reasons of Party A (materials or other materials), the two parties will issue a separate order and sign the contract.


    Six, the number of finished products delivered by Party B is missing, which is to be repaid by two times the cost of goods per thousand units and three pieces below.

    More than three items shall be compensated according to the cost of the goods plus two times the retail price of the market (deducted from the processing fee).


    Seven, large delivery Party A to do the tail part of the process, found product oil pollution, jumper, rotten hole, drawnwork, chromatic aberration and other conditions, notify Party B to solve.

    If Party B fails to return to the company in time, or the delivery period is urgent, Party A's helper will distribute the film and return the execution. Party A deducts the work time of Party B's rework, which is deducted from the processing fee at the rate of 3 yuan per hour.


    Eight, Party A provides every cloth and material, according to the number of materials required to make the calculation of material loss, the cost of the excess part shall be borne by Party B.

    Party a must check the incoming materials, check all incoming materials and sign in a certain time.

    If the cloth and material can not be produced if there is any quality problem, they should be handed over to Party A in time.

    Otherwise, the loss will be borne by Party B.


    Nine. Check the cloth before cutting the bed.

    If it is found that there are quality problems (including short yards of cloth) and the actual dosage exceeds the amount of the production, the Party A shall immediately notify Party A to discuss the solution.


    Ten, Party A should do the following procedure for Party B to calculate the cost: phoenix eye 0.1 yuan / grain, button door 0.025 yuan / grain, Zao Zao 0.018 yuan / grain, cut the line 0.2 yuan / piece.


     

    Garment processing contract


    Source: Author:


      

    Eleven, the way of settlement: according to the actual shipment quantity of Party A, 5 per thousand can accept the inferior products according to the situation (up to half price per unit price), and the super defective products are deducted at cost price.

    The monthly shipment will be settled from 25 to 30 next month, and will be notified if there are any special circumstances.


    Twelve, Party A and Party B should act in a sincere and cooperative manner. If they fail to negotiate because of contracts or other disputes, the two parties can solve them through legal channels.


    Thirteen. The contract is in two copies. Each Party A and B shall hold one copy and have the same legal effect. This contract shall come into force on the date of signing by the representatives of both parties.


    Party A (Supplier): Party committee (Party A): Party B (processing side):


    Address: the address of the people's Republic of China?


    Authorized representative: the company is authorized by the company: the company is stamped with: the company is stamped with:


    Authorized representative: the company is authorized by the company: the company is stamped with: the company is stamped with:


    Date: 1, 1, 2, 2, 2, 2, 2, 2, 2, 2, 2, 2, 2, 2, 2, 2, 2, 2, 2, 1, 2, 2, 1, 2, 2, 1, 2, 2, 1, 2, and 1, respectively.


     
    • Related reading

    Mortgage Loan Contract Template

    Contract template
    |
    2010/5/20 18:30:00
    37

    How To Deal With Collective Contract Disputes?

    Contract template
    |
    2010/5/19 15:44:00
    36

    Model Contract For Technology Pfer

    Contract template
    |
    2010/5/19 15:05:00
    23

    Contract Of Loans For Special Funds

    Contract template
    |
    2010/4/30 9:28:00
    59

    Contract Of Loans For Special Funds

    Contract template
    |
    2010/4/24 11:39:00
    68
    Read the next article

    Working Standards Of Party Committees

    In order to give full play to the political core role of the Party committee in the enterprise, to standardize and institutionalize the work of the Party committee, to adapt to the new situation and the requirements of the new task, and to formulate the Party committee working system according to the requirements of the CPC Central Committee on Party Building and the actual work of the group. First, the main responsibilities and tasks of the Party committee of the group. First, conscientiously i

    主站蜘蛛池模板: 337p日本大胆欧美人术艺术精品| 亚洲老妈激情一区二区三区| 久久久久久久人妻无码中文字幕爆| 91影院在线观看| 最新亚洲春色av无码专区| 国产精品欧美一区二区在线看 | 午夜精品久久久久久毛片| 中文字幕日韩精品无码内射 | 欧美大荫蒂毛茸茸视频| 国产精品电影一区二区三区| 亚洲成人一级电影| 2021国产麻豆剧果冻传媒影视| 欧美日韩性猛交xxxxx免费看| 国产精品沙发午睡系列999| 亚洲午夜精品一区二区| 你懂的手机在线视频| 最近2019免费中文字幕视频三| 国产欧美视频在线| 久久无码专区国产精品| 色天天综合色天天看| 狼群影院www| 国产麻豆免费观看91| 亚洲国产欧美日韩一区二区三区| 久久久久999| 日本中文字幕第一页| 四虎影视成人永久免费观看视频| 一本大道在线无码一区| 焰灵姬你下面好紧| 国产精品久久久久影院| 久久精品aⅴ无码中文字字幕重口 久久精品a亚洲国产v高清不卡 | 国产真实乱了在线播放| 久久精品国产99精品最新| 色婷婷中文字幕| 好吊妞在线成人免费| 午夜福利一区二区三区高清视频| yy6080一级毛片高清| 欧美日韩在线观看一区二区| 国产日韩av免费无码一区二区| 亚洲免费电影网站| 领导边摸边吃奶边做爽在线观看| 成人网站免费看黄a站视频|